The sawing center was to be accommodated in two hall sections. The bridge storage system for material with a length of 9 meters was to be stored in silo construction up to a height of 20 meters. The storage and retrieval machine moves above the rows of racks and the goods receiving station can be moved out of the hall area through a gate. This ensures better unloading and loading of the cassettes.
Two band saws are connected to the storage system via a PICK system. The cassettes pass through a hall section at the retrieval stations, which can also be designed as a fire section.
After the sawing process, the sawn blanks are removed from the sawing tables by a pick & place robot and palletized. A robot can operate both sawing machines via a traversing axis. A tool changer enables the handling of different sized sawing blanks and the placement of intermediate layers on the pallets.